Product Details:
|
|
Place of Origin: | China |
---|---|
Brand Name: | DZ |
Certification: | CE ISO |
Model Number: | LPDC |
Payment & Shipping Terms:
|
|
Minimum Order Quantity: | 1 Set |
Price: | Negotiable |
Packaging Details: | International standard seaworthy package, wooden cases and plastic film will be pack or as your requirement for die casting machine. |
Delivery Time: | 2months |
Payment Terms: | L/C, T/T, Western Union |
Supply Ability: | 10sets/per month |
Detail Information |
|||
Application: | Industry | Dimensions: | 7000x7000x3680(H) |
---|---|---|---|
Process: | Low Pressure Die Casting,Die Casting+Machining,Die Casting-deburring- Machinery,Casting. Deburring .Drilling .Threading | Product Name: | Low Pressure Die Casting Machine |
Certification: | ISO9001-2008 | Item: | Die Casting |
Weight: | 8000KG | Feature: | Automatic |
Quality Control: | 100% Inspected Casting Parts | Lead Time: | 45 Days |
High Light: | aluminium pressure die casting machine,low pressure die casting process |
Product Description
CODE | BASIC EQUIPMENT | LPDC1-Manipulator | LPDC2-Manipulator |
1 | Manipulator | Light weight,hight running speed | |
2 | Furnace | 1.The electric furnace remains stationary;Die automatic falling and smooth running,Casting quality is guaranteed. 2.Large melt content up to 1800kg;There's very little change in temperature after feed the stove 3.The furnace is round and does not deform easily,It is effectual to keep warm, energy conservation.90KW was bable to satisfy 1-Manipulator |
1.The electric furnace remains stationary;Die automatic falling and smooth running,Casting quality is guaranteed. 2.Large melt content up to 2000kg;There's very little change in temperature after feed the stove.No need for frequent feeding. 3. Energy conservation:Two manipulator share an electric furnace can save the cost of electric furnace insulation. can save about 800 yuan one day |
3 | operating system | One person operates a equipment | One person operates 2-manipulators like One person operates 2 equipments and Can produce two different products at the same time |
4 | Riser tube | 3 riser tubes,be Able to meet different product process requirements. | |
5 | Riser Tube heating method | 1. The riser tube on furance cover are with ceramic sealings; 2. Riser Tube heating method: Medium frequency electricity heating, power 60KW; average power consumption: 7KW; 3. Heating time till 900℃ ≈ 90 seconds 4. Contains water cooling system. | |
6 | hydraulic system | 1.Components supplies with internationa high quality brands: SUN,REXROTH,YUKEN etc. 2.The components are special used, with performances of high stability, strong protection from contamination, suitable for water-based hydraulic oil operation etc. 3.The hydraulic oil ( Ethylene glycol ) works at low temperature, stable quality, not get deteriorated. 4.Servo motor driving, no vibration. saves 40% of the electricity. | |
7 | Die Cleaning Chamber | 1.Die Cleaning Chamber: shot blasting device (copper powder blasting) for the cleaning of the dies. 2.The dies can be moved to cleaning chamber automatically for cleaning process @ heavy oxidized contaminations condition. | |
8 | Automatic picking | 1.Receiving car: with performances of moving up-down; forward & backward; 2.Transport the casting products to storage vehicles directly. | |
9 | Change the mould | Quick die change flange, 2 mins by munually ,There is a dedicated mold change station | |
10 | Function | It has the function of low-pressure casting of copper alloy and zinc alloy. |
Enter Your Message